Issue 42-5Vol 42 · Issue 5Issue 42-4Vol 42 · Issue 4Issue 42-3Vol 42 · Issue 3Issue 42-2Vol 42 · Issue 2Issue 42-1Vol 42 · Issue 1Issue 41-6Vol 41 · Issue 6Issue 41-5Vol 41 · Issue 5Issue 41-4Vol 41 · Issue 4Issue 41-3Vol 41 · Issue 3Issue 41-2Vol 41 · Issue 2Issue 41-1Vol 41 · Issue 1Issue 40-6Vol 40 · Issue 6

Steel Pile Used at Anderson Street Bridge

Published July 19, 2019 · 2 min read · Last reviewed November 2, 2026

Contributed by Nucor Skyline

Steel Pile Used at Anderson Street Bridge

HISTORY

In 1969, in conjunction with the expected openings of the Naval Training Center (1968), Florida Technological University (now University of Central Florida 1969), and Walt Disney World (1971), the SR 408 project began as another east-west corridor through downtown Orlando. This route was built to relieve traffic on SR 50.

PROBLEM

The Anderson Street overpass was older, failing, and needed to be rebuilt. This was the first phase of what would become a much bigger project, the I-4/SR408 project, consisting of twelve structures to be built in a series of bridges, overpasses, and flyovers.

The local geologic conditions, along with site-specific constraints and the structural loading requirements of the project, called for deep foundations to be used at the site. Initially, the design called for 11 24” precast concrete piles. However, several attempts to drive the concrete test piles to depth were unsuccessful, due to the high rebound effects. Rebound is caused when displacement piles are driven through soils that don’t allow the pore water pressure to dissipate quickly enough. The temporary increase in the pore water pressure prevents the pile from being driven to the required elevation. Different lengths and configurations were tested with the same results.

Steel Pile Used at Anderson Street BridgeSOLUTION

An HP 14X89 steel pile was then test driven and reached design depth with no difficulties experienced. The deep foundation for this pier, and ultimately the rest of the project, were redesigned to allow for the use of steel H-piles.

The success of the H-pile installation at the Anderson Street overpass led the Florida Department of Transportation to redesign the bigger, I-4/SR408 project using HP 14X89 and HP 12X53 from Nucor Skyline, instead of the precast concrete piles.

Location
Orlando, FL

Owner
Florida Department of Transportation and Orlando Orange County Expressway Authority

General Contractor
PCL, Inc. – Orlando, FL

Engineer
GRL Engineers, Inc. – Orlando, FL

Products
HP14x89 / ASTM A572 GR 50

Project Time Frame
2009