Now Reading
Vertical Cylindrical Fender Design for Tugboat Operations at Port of Sept-Îles, Canada
Volume 42 Issue 4
Volume 42 Issue 3
Volume 42 Issue 2
Issue 42-2 - Jan/Feb 2026
Volume 42 Issue 1
Issue 41-6 - Nov/Dec 2025
Volume 41 Issue 6
Volume 41 Issue 5
Volume 41 Issue 4
Volume 41 Issue 3
Volume 41 Issue 2
Volume 41 Issue 1
Volume 40 Issue 6
Volume 40 Issue 5

Vertical Cylindrical Fender Design for Tugboat Operations at Port of Sept-Îles, Canada

Situated on the North Shore of the Gulf of St. Lawrence in Canada, the Port of Sept-Îles is a major hub for iron ore exports and industrial bulk shipping, while also supporting regional maritime transport and isolated coastal communities. The port recently reopened its modernized Monseigneur-Blanche Terminal, originally built in 1956 and serving as its primary operational base and tugboat station since 2006.

As part of the modernization, ShibataFenderTeam designed and supplied three customized fender systems, each comprising 16 Cylindrical Fenders (Ø600×300 mm, L4400 mm), five steel panels (2875–4000×3440 mm) and 16 SC Fenders (500x500x500 mm), together with the required mounting hardware. The fender configuration reflects an approach characteristic of Quebec, where vertically arranged Cylindrical Fenders are used in front of the fender panels. For the Monseigneur-Blanche Terminal, SFT adapted this established arrangement to the particular demands of tugboat operations.

Tugboats present a distinctive contact scenario: their own fenders vary in size and position along the vessel side, while hull geometry introduces further variation in the contact area. The Cylindrical Fenders provide an adaptable contact surface for these varying contact conditions while the vertical arrangement provides fender coverage over a relatively large area as water levels change – an important consideration given the approximately 4–5 m tidal variation at the terminal. Maintenance also remains straightforward: the Cylindrical Fenders can be lifted from their installed position and brought onto the quay for servicing or repair.

Translating the design into the installed berth geometry presented another challenge. As the supporting piles were driven at an angle, their final installed position could vary compared with the theoretical geometry shown in the design drawings. Rather than relying on fixed connection points, the panel connections therefore had to accommodate these field variations. SFT incorporated adjustable brackets and slotted holes to provide the required flexibility during installation.

The Monseigneur-Blanche Terminal shares its jetty with the adjacent cruise facilities, where ShibataFenderTeam supplied the fender systems in 2009. The latest installation for the tugboat terminal builds on this long-standing presence, adding another SFT reference at the Port of Sept-Îles.

Scroll To Top
NuCore Skyline