LATEST ISSUES OF PILE BUCKAll issues →
Issue 42-5Vol 42 · Issue 5Issue 42-4Vol 42 · Issue 4Issue 42-3Vol 42 · Issue 3Issue 42-2Vol 42 · Issue 2Issue 42-1Vol 42 · Issue 1Issue 41-6Vol 41 · Issue 6Issue 41-5Vol 41 · Issue 5Issue 41-4Vol 41 · Issue 4Issue 41-3Vol 41 · Issue 3Issue 41-2Vol 41 · Issue 2Issue 41-1Vol 41 · Issue 1Issue 40-6Vol 40 · Issue 6

Røenne Port Expansion, Denmark, Equipped with 19 ShibataFenderTeam Element Fender Systems

Published March 8, 2023 · 2 min read · Last reviewed November 2, 2026

Contributed by ShibataFenderTeam

Røenne Port Expansion, Denmark, Equipped with 19 ShibataFenderTeam Element Fender Systems

Centrally located on the Baltic Sea, Røenne harbor is the gateway to the island  of Bornholm and one of the largest cruise ports in Denmark. Currently it is undergoing an expansion plan that will contribute to future-proofing its function as a commercial port. The second phase of this plan includes the construction of a new multi-purpose quay, to be used by cruise and general cargo vessels.

Our team at the German office, in partnership with the contractor, designed and delivered 19 Element Fender Systems, each one consisting of 2 FE Element Fender (1250×1000 mm, G2.0) and a closed box panel (2250×2600 mm) with UHMW-PE pads. The order also included 22 T-Head Bollards with different load rating (125t and 200t) and 10 Steel Ladders.

Following the SFT holistic approach, this customized solution considers all project conditions including that the terminal is exposed to waves and currents, and that the design will guarantee safe berthing of the two types of vessels: cruise and general cargo. With that in mind, our engineering team designed a larger panel to reduce the pressure on the cruise hull, while keeping it safe for the cargo vessels.

We at the ShibataFenderTeam Group are happy to have contributed to a safe berthing environment and thanks all stakeholders for the confidence set upon us for this project.