Now Reading
Nucor Skyline Supplied NZ 26 Sheet Pile and C6x8.2 Double Channel Walers for Gardner’s Basin Back Bay Project
Volume 40 Issue 1
Volume 39 Issue 6
Volume 39 Issue 5
Volume 39 Issue 4
issue 39-3
Volume 39 Issue 3
Volume 39 Issue 2
Issue 39-1 - Jan/Feb 2023
Volume 39 Issue 1
Issue 38-6 - Nov/Dec 2022
Volume 38 Issue 6
Issue 38-5 - Sep/Oct 2022
Volume 38 Issue 5
Issue 38-4 - Jul/Aug 2022
Volume 38 Issue 4
Issue 38-3 - May/Jun 2022
Volume 38 Issue 3
Volume 38 Issue 2

Nucor Skyline Supplied NZ 26 Sheet Pile and C6x8.2 Double Channel Walers for Gardner’s Basin Back Bay Project

Gardner’s Basin Back Bay

Gardner’s Basin Back Bay

HISTORY

Beyond the casinos and boardwalk of Atlantic City, NJ sits Gardner’s Basin Back Bay. The area at the north end of Absecon Island is home to the aquarium, commercial fishing boats, outdoor concerts, dolphin tours, Crafters Village, and a collection of charming restaurants. This historic area of Gardner’s Basin Back Bay is getting a $3.6 million renovation.

PROBLEM

Gardner’s Basin is situated on Absecon Inlet, which leads from the Atlantic Ocean through the barrier islands in Atlantic County, NJ. Storm surge along the eastern seaboard causes billions of dollars’ worth of damage on a yearly basis.

Nowhere is that as evident as the coastline of New Jersey. Several devastating storms have hit the shore over the last 20 years, including Hurricane Andrew and Superstorm Sandy.

Over the years, these storms, storm surges, and other issues have caused the erosion of the timber bulkhead that protected the area around Gardiner’s Basin. The lack of a bulkhead contributes to flooding on a regular basis in the Back Bay.

SOLUTION

The renovations in the Back Bay will include a new bulkhead in the inlet. The contract for the bulkhead project was awarded to Walters Marine Construction Inc., located in Ocean View, NJ. Walters Marine has worked with Nucor Skyline over the years on many different projects, and trusted Nucor Skyline with their steel sheet pile needs for this project.

Nucor Skyline supplied NZ 26 sheet pile and C6x8.2 double channel walers for this job. Prior to delivery, the sheet piles were coated with 16mils Amerlock 2GF at 100% on both sides to extend their life in the harsher marine elements. The NZ 26 sheet pile, with the Larssen interlock, has one of the most watertight seals, making it ideal for marine use.

Walters Marine used a Manitowoc M65W Crawler Crane and an HPSI 150 vibratory hammer for the installation of the sheet piles in the sandy and silty soils of the basin. The piles were driven seamlessly into the soils, allowing construction to be completed quickly and efficiently.

The walers were installed once the sheet piles were driven to design depth. Following this installation, wooden forms were built to create the new concrete bulkhead, using the sheet piles as the sturdy foundation.

PROJECT PARTNERS

Owner

Atlantic City, NJ

General Contractor

Walters Marine Construction Inc. – Ocean View, NJ

PRODUCTS

Sheet Pile: NZ 26 sheet pile @ 45’ (765 tons) Walers: C6x8.2 double-channel walers

PROJECT TIME FRAME

March 2019 to October 2020

 

 