| Driven piles on a production job | A fixed leader rig with a hydraulic impact hammer | The leader holds the pile and the hammer in line, so the rig moves quickly from pile to pile. | Check the pile length and weight against the leader capacity. |
| Batter piles | A rig whose leader inclines to your batter | The leader tilts, so the pile is driven at the angle on the plans. | Capacity drops as the leader leans. Ask for the rating at your batter. |
| Sheet piles, or driving near structures | A telescopic leader rig with a vibratory hammer | The leader adds crowd force and control, and the rig can press as well as vibrate. | Check the crowd force and the ground conditions. |
| One machine that drives and drills | A multipurpose leader rig | The same rig can run a vibratory hammer, an impact hammer, or a drill. | Ask how long it takes to change attachments. |
| Short piles or a tight site | A compact pile driving rig | A lighter rig moves in fewer loads and fits smaller sites. | Confirm the longest pile it can handle. |
| A rig for one job | A rental, with the hammer included | Renting avoids the cost of owning a rig you will not use every month. | Ask about the rental term, delivery, and field service. |