| Clamshell, dragline, or other continuous heavy work | Duty-cycle crane | It is built to repeat heavy cycles all day. | Match the line pull and the cycle time to the work. |
| To load barges or handle scrap and bulk material | Material handler | A raised cab and a long reach give fast, repeated loading. | Check the reach, the attachment, and the ground or deck under it. |
| To lift long loads such as piles, pipe, and rail | Spreader beam | It holds the slings apart and keeps the load level. | Check the working load limit and the spread against the load. |
| To lift with low headroom | Lift beam | A lift beam needs less height above the load than a spreader beam. | It bends under load, so it is heavier for the same capacity. |
| To lift shipping containers | Container spreader or lifting lugs | They lock into the corner fittings of the container. | Confirm the container size and the gross weight. |
| A crane for one project | Rental | Renting saves capital and matches the machine to the job. | Ask about transport, setup, service, and operator training. |