Nucor Skyline Supplied NZ 26 Sheet Pile and C6x8.2 Double Channel Walers for Gardner’s Basin Back Bay Project
Contributed by Nucor Skyline (supplier case study format: History/Problem/Solution/Products). HISTORY Beyond the casinos and boardwalk of Atlantic City, NJ sits Gardner’s Basin Back Bay.…

AZ Sheet Piles Provided By Nucor Skyline Saved 10% in Construction Time
Contributed by Nucor Skyline (vendor case study with project partner list and product data). HISTORY The SODO neighborhood of Seattle, WA makes up part…

Electricity From Hydropower: Bauer Involved in the Teesta VI Hydro Electric Project in India
Contributed by Bauer (company press release). Singtam, Sikkim, India – BAUER Engineering India Private Limited, a subsidiary of BAUER Spezialtiefbau GmbH, was tasked by…

CMI’s AlumiGuard™ Protects Property, Saves Money for Simmons Pointe Residents
Contributed by CMI (vendor case study of AlumiGuard). Since 2011, the residents of Simmons Pointe subdivision, in Mount Pleasant, S.C., have relished picturesque sunrises,…

Stator Load-In Via Barge Provides Well-Grounded Solution
Text itself shows client authorship (Mammoet-authored release). Consider 'Contributed by'. Alex decides. Canada’s second-largest nuclear facility is undergoing a major refurbishment so that it can supply clean energy for decades to…

Contractor Drives Micropile Production, Safety with KLEMM Equipment
Contributed by Equipment Corporation of America / KLEMM (dealer case study with promotional links to ecanet.com). Technical Foundations has been providing specialty foundation contracting…

Red Dog Mine Alaska: Ground Improvement in Permafrost
Text itself shows client authorship (Bauer project report). Consider 'Contributed by'. Alex decides. Alaska, USA – Red Dog Mine, one of the world’s largest…

San Francisco Bay – Home of World’s First Floating Fire Boat Station
Seemingly overnight, a new structure appeared on San Francisco’s waterfront. Situated at Pier 22½ just behind historic Firehouse 35 and nestled beside the Bay…

Timber Piles Replaced With Steel Pipe Piles at Seismically Vulnerable Dock
Contributed by Nucor Skyline (supplier case study format: History/Problem/Products/Project Partners). Seattle, Washington History The Washington State Ferry System transports vehicle and passenger traffic throughout…

UMA Supports South Carolina Manufacturer’s Expansion with Micropiles
Contributed by UMA Geotechnical Construction By Brian M. Fraley, Fraley Construction Marketing Specialty subcontractors like UMA Geotechnical Construction, Inc. (UMA) rarely get the credit,…

Great Lakes Dredging Sends Sediment Flying with the Ditch Doctor
Contributed by Ransome Attachments (vendor-supplied case study promoting the Ditch Doctor). View the complete article here. Great Lakes Dredge & Dock Company’s Rivers and…

Panama Canal’s 3rd Crossing Foundation Optimization with Loadtest O-Cells
Contributed by Fugro Loadtest (byline William F. Knight and Brian Haney, Fugro Loadtest; promotes O-Cell and Sonicaliper). View the complete article here. Colón, Panama…