Now Reading
Retiring – Equipment Must Go
Volume 40 Issue 5
Volume 40 Issue 4
Volume 40 Issue 3
Volume 40 Issue 2
Volume 40 Issue 1
Volume 39 Issue 6
Volume 39 Issue 5
Volume 39 Issue 4
issue 39-3
Volume 39 Issue 3
Volume 39 Issue 2
Issue 39-1 - Jan/Feb 2023
Volume 39 Issue 1
Issue 38-6 - Nov/Dec 2022
Volume 38 Issue 6
pile dynamic analysis test

Retiring – Equipment Must Go

After 75+yrs piling contractor retires.
Diesel hammers: Bir. 4505 ($45,000) — Ice 520 with hyd. starts ($9,800) — Kobe K13 ($9,000)
Auger cast rigs — Grout pumps — Pr. 150 ton rams — Electric pump — Hoses — Test gauge — Jet pumps — Follow blocks — Leeds spotters                      
Scroll To Top
NuCore Skyline