Issue 42-5Vol 42 · Issue 5Issue 42-4Vol 42 · Issue 4Issue 42-3Vol 42 · Issue 3Issue 42-2Vol 42 · Issue 2Issue 42-1Vol 42 · Issue 1Issue 41-6Vol 41 · Issue 6Issue 41-5Vol 41 · Issue 5Issue 41-4Vol 41 · Issue 4Issue 41-3Vol 41 · Issue 3Issue 41-2Vol 41 · Issue 2Issue 41-1Vol 41 · Issue 1Issue 40-6Vol 40 · Issue 6

Impressive System Designed For Caven Point Marine Terminal

Published April 6, 2020 · Last reviewed November 2, 2026

Contributed by Nucor Skyline' label

Impressive System Designed For Caven Point Marine Terminal

Jersey City, New Jersey

History

The Caven Point Marine Terminal was severely impacted by Superstorm Sandy in 2012. The area is home to the United States Army Corps of Engineers’ (USACE) working fleet and serves as the base for rescue missions up and down the eastern seaboard.

Problem

A new boat lift was needed to maintain critical service vessels at Caven Point. The boat lift bulkhead had to be able to provide vertical support for the boat lift hoists while resisting horizontal soil and crane loads without tie backs.

Impressive System Designed For Caven Point Marine TerminalSolution

The USACE chose Simpson & Brown Marine Construction to complete the boat lift project at Caven Point. There was a conceptual design from the USACE that the contractor brought to Nucor Skyline. However, the final project was a design-build, and that is where Nucor Skyline and their in-house engineering team were able to shine.

Using HZ 1080M A king piles and AZ 26-700 intermediate sheets, the engineers were able to design a king pile wall to fit the unique layout required by the USACE. Drawings from Nucor Skyline’s drafters allowed for seven different pile types with various lock orientations in order to work in the constricted area. The HZ piles were coated at 50%, while the AZ sheets were coated at 100% to help with corrosion protection. Included in the order were 1,000 feet of coated loose connectors for the combi-wall system.

Each pile had to be coated and delivered in a specific sequence in order to be properly installed. The piles were driven from a barge at the site. Nucor Skyline worked closely with both Simpson & Brown Marine Construction and the USACE to keep product arriving in the right order and in a timely manner so that there was never down time during the installation.

“Nucor Skyline’s design team developed an impressive system to meet the stringent layout and loading requirements set by the USACE. This efficient design is what led to Skyline and S&B’s success in coordinating proper deliveries, maintaining an aggressive schedule, and achieving the installation requirements.”

– Andrew Scrutchfield, Project Engineer
Simpson & Brown, Inc.

Impressive System Designed For Caven Point Marine Terminal

Project Partners

Owner
US Army Corps of Engineers

General Contractor
Simpson & Brown, Inc. – Cranford, NJ

Foundation Contractor
Linde-Griffith Construction – Newark, NJ

Products

Steel Wall System: HZ 1080M A and AZ 26-700 (520 tons)

Project Time Frame

March 2018 to September 2018