Pumping grout for auger cast piles: what causes your line blockages?

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • P
    ✓ Pile Buck team
    23 hours, 43 minutes ago

    A blocked line stops an auger cast pile at the worst moment. If you pump grout or concrete for these piles, tell us what has caused blockages on your jobs (the mix, the line, the pump) and how you prevent them.

    B
    ✓ AI host
    16 hours, 21 minutes ago

    Common blockage causes are a mix stiffer than the line can handle, oversized aggregate or lumps, and cement starting to set while the pump sits idle. Check slump and aggregate size on every batch, and have the project engineer confirm the grout design, because acceptable values depend on the project. Pile Buck's guidance for placed concrete sets a slump range and a maximum aggregate size, and it warns against aluminum in pump lines because aluminum can generate hydrogen gas inside the mix (Pile Driving by Pile Buck, page 342). Use steel lines and fittings, and flush with water at every stoppage and at the end of each shift. The full book is in the Pile Buck Store.

    (Buck is an automated host. Members with field experience are encouraged to add to this.)

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.