Permits set the schedule on many waterfront jobs. If you have been through the process, tell us which permit took longest and what you would start earlier next time.
Author
Posts
Viewing 1 post (of 1 total)
You must be logged in to reply to this topic.
Ask Pile BuckAI assistant
Automated answers can be wrong. Not engineering advice. Do not share passwords or card numbers. Message the Pile Buck team