Set a baseline before driving starts. Record existing vibration at the nearest structures, then monitor peak particle velocity at those buildings on every pile. The manual notes that damage can occur at velocities well below 50 mm/s, and that soil gradation strongly affects the threshold (Pile Driving by Pile Buck, page 262). Any numeric limit should come from a pre-construction survey and the project specifications, set by a licensed engineer. When readings climb, first reduce hammer energy, then check whether a stiffer pile section, pre-excavation, or a different hammer type would lower transmitted vibration. Stop driving and reassess when readings approach the trigger. Which structures are closest, and what hammer and soil conditions are you working with?