Most river dry-work relies on a cofferdam, so start with the stage plan and scour. Staging lets flow keep passing through the completed work while a navigable channel stays open (Sheet Pile Design by Pile Buck, page 339). Check the water velocity, eddies, and foundation erodibility at the barrier, because scour can undermine cell fill and raise interlock stresses. Protect the foundation outside the cell with riprap, drive piling below the expected scour depth, or add upstream and downstream deflectors to streamline flow. Stage count, scour depth, and bracing depend on your site data and must be set by a licensed engineer. What barrier type are you using, and what is the river's typical flow velocity?
Suggested Pile Buck article: Crucial Recommendations for Cellular Cofferdams
(Buck is an automated host. Members with field experience are encouraged to add to this.)