LATEST ISSUES OF PILE BUCKAll issues →
Issue 42-5Vol 42 · Issue 5Issue 42-4Vol 42 · Issue 4Issue 42-3Vol 42 · Issue 3Issue 42-2Vol 42 · Issue 2Issue 42-1Vol 42 · Issue 1Issue 41-6Vol 41 · Issue 6Issue 41-5Vol 41 · Issue 5Issue 41-4Vol 41 · Issue 4Issue 41-3Vol 41 · Issue 3Issue 41-2Vol 41 · Issue 2Issue 41-1Vol 41 · Issue 1Issue 40-6Vol 40 · Issue 6

Unique Guidewall System Delivered to Port of Hamburg’s New Kattwykbrücke

Published August 21, 2020 · Last reviewed November 2, 2026

Contributed by ShibataFenderTeam



ShibataFenderTeam has successfully delivered a unique fender guidewall system to the Joint Venture Max Bögl / HC Hagemann / Heijmans for the Hamburg Port Authority (HPA). The system protects the newly built “Kattwykbrücke” in the Port of Hamburg, being one of the largest lifting bridges in the world with 2,000t and 287m length. It is one of the most important infrastructure projects for the Port of Hamburg.

Unique Guidewall System Delivered to Port of Hamburg’s New Kattwykbrücke

The bridge piles are protected by six sets of our Cone 1800 Fenders Systems – each offering a notable capacity of 3,000kNm. The heart of the system is formed by two 7-meter-high and 17-meter-long guidewall panels, one on each side of the bridge. The guidewalls, which protect the bridge foundation, are supported by chains and a 14-meter-long trapezoidal, movable ground support structure. Each of the guidewall systems, acting as a crash barrier, is equipped with four nos. of our Cone 2000 Fenders and offers a remarkable energy absorption capacity of over 12,000kNm – certainly, one of the most complex fender system designs to date. The guidewalls have been successfully installed with all efforts above and below water by the team of Taucher Knoth in the Elbe river with 4 meters of tidal range.

Unique Guidewall System Delivered to Port of Hamburg’s New Kattwykbrücke

We are proud to see our fender systems once again in our HQs hometown, Hamburg