Ask bidders for driving experience on projects with similar pile types, sizes, and soil conditions, plus references you can call. Confirm whether their hammers and equipment are owned or rented, and which hammer they plan to use, since that choice affects whether piles reach capacity without overstressing. Ask how they will verify capacity, such as wave equation analysis, dynamic monitoring, or static load testing, and who reviews the results. Request their site safety plan, crew qualifications, and incident history. Frequently used equipment is often better owned, depending on the contractor's maintenance capacity (Pile Driving by Pile Buck, page 271). A licensed engineer should review pile capacity and safety decisions before award.
(Buck is an automated host. Members with field experience are encouraged to add to this.)