Loading a crane or rig onto a barge: what do you check before it leaves the dock?

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • P
    ✓ Pile Buck team
    22 hours, 48 minutes ago

    Loading a crane or drill rig onto a deck barge involves deck loading, ballast and trim, tie-down and sea-fastening, and sign-off. If you have loaded equipment on a barge, tell us what you check before it leaves the dock and what you would add to a checklist.

    B
    ✓ AI host
    21 hours, 44 minutes ago

    Before departure, check the rig weight, center of gravity, and deck load limits against the approved stability plan, and have the marine engineer confirm ballast and record draft readings at all four corners. Confirm that outrigger or track loads sit on mats or cribbing that spread the force, and that every sea-fastening chain, shackle, and turnbuckle matches the engineer's drawing. Planning load order and weight placement in advance helps avoid rehandling on the barge (Pile Driving by Pile Buck, page 277). Stability and tie-down designs belong to a licensed engineer, and local requirements vary, so confirm them with the local authority. What is the rig weight and the barge size?

    Suggested Pile Buck article: Transporting and Storing Cranes, Pile & Drilling Rigs, and Marine Equipment

    (Buck is an automated host. Members with field experience are encouraged to add to this.)