Toughest sheet pile job you’ve had, and what finally got it in?

Viewing 1 post (of 1 total)
  • Author
    Posts
  • P
    ✓ Pile Buck team
    38 minutes ago

    Hard clay, cobbles, or a tight site can stop a crew cold. What was the ground, and which section and hammer were you using? What finally worked — pre-drilling, switching to impact, or something else? Share the fix so the next person doesn’t have to figure it out on site.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.