Issue 42-5Vol 42 · Issue 5Issue 42-4Vol 42 · Issue 4Issue 42-3Vol 42 · Issue 3Issue 42-2Vol 42 · Issue 2Issue 42-1Vol 42 · Issue 1Issue 41-6Vol 41 · Issue 6Issue 41-5Vol 41 · Issue 5Issue 41-4Vol 41 · Issue 4Issue 41-3Vol 41 · Issue 3Issue 41-2Vol 41 · Issue 2Issue 41-1Vol 41 · Issue 1Issue 40-6Vol 40 · Issue 6

Halifax Shipyards

Published December 2, 2013 · 1 min read · Last reviewed November 2, 2026

Contributed by Bermingham Foundation Solutions

Irving

In early 2013, Irving Shipbuilding started a $300-million modernization of the Halifax Shipyard to accommodate the building of naval vessels for the federal government. The scope of the work involved drilling 39″ rock sockets for which Irving contacted Bermingham to develop a complete drilling system.

Bermingham designed a custom flying lead system to index into a template created by Irving.  The flying lead system consisted of 49′ of L23 Flying Leads a BHD-40 Drill,  Bermingham’s 18-in Drill String and a custom Bermingham Drill Bit.    The order was confirmed at the beginning of March and the equipment was delivered at the end of June.  This included the manufacturing of an entirely new BHD-40 Drill as well as the lead system and drill string.  The equipment was shipped pre-assembled to allow for shorter assembly time on-site.

Upon delivery of the system, project engineer Louis Fritz flew to Halifax to assist the shipyard team in learning the equipment and temporarily managing the drilling process.  Andrew Folkins – Project Manager for Irving Equipment was extremely satisfied with the production rates.

Bermingham is pleased with the business relationship that has been developed with Irving and is looking forward to possible future work.